Hi,

We are using the functionality calibration process. So when the calibration order is created inspection lot is created. Problem is PM people confirming the PM Order but not doing RR and UD for the corresponding inspection lot. due to this lot of open inspection lots in the system.

what user exit can be used to prevent this means.... when the user confirm the Calibration order if the corresponding inspection lot's RR and UD is not done then system should not allow confirmation of the calibration order.

Thanks

Kumar 

Accepted Solutions (0)

Answers (2)

Answers (2)

peter_atkin
Active Contributor
0 Kudos

Kumar 

The user-exit/BADI you require will depend on where in the order processing you want to make the check e.g. at order TECO, at order CLSD, at final confirmation, etc.

PeteA

rakesh_mane
Active Contributor
0 Kudos

Hello

Please check Below

User exits

CMFU0002

CONF0001

CONFPM05

CONFPM02

BADI

WORKORDER_CONFIRM