Skip to Content
0
Former Member
Nov 13, 2014 at 03:35 PM

Source Inspection - Dynamic Rule - Skip Lot

64 Views

Experts,

I can not create Skip Lots using Source Inspection,

If I use Souce Inspection with ,

  • Insp. plan type 51
  • 0101 as inspection type at Quality view Material Master
  • QI02 also with inspection type 0101, SI- no GR flagged
  • Dynamic Rule at Lot Level

DMR,

  • Stage 1 Normal Insp;ISt flagged;Insp.Qty.1; A=Stage2, R=Stage1
  • Stage2 Skip flagged;Skip Qty 10; A=Stage2, R=Stage1

the dynamic rule is visible at lots created via QI07, showing the stage

Unfortunately the inspection stage does not change as I expected, it starts with starting stage e.g. 1 but won´t change to the next stage, independent if I use “usage decision” or “at lot leve”l at dynamic rule.

How should the “std” system interact, where should the skip status occur?

Thanks in advance

Jörg