Hi,

We want to transfer Material from one Bin to another Bin ( Full Pallet)

Hence I am trying LT01 with Mvt type 999

My stock are lying in multiple Quants in the same Bin as below

Hence when I save TO , System creates one TO per Quant i.e. 5 TO's in above case.

Currently it creates TO as below

How I can get it done with only one TO with multiple Line Items?

Basically , I wanted to create TO in the background with a scheduled Job.

Thanks,

JK

Accepted Solutions (0)

Answers (3)

Answers (3)

MANIS
Active Contributor

with LT01 you can create only one line item

Former Member
0 Kudos

Hi Manish,

Thanks for your reply,

Please suggest some other method so that there will be only one TO with multiple lines for Bin to Bin transfer ( I wanted to have it in Background scheduled Job)

Thanks,

JK

MANIS
Active Contributor
0 Kudos

What is the exact requirement,why you are using LT01, To schedule a job u need to have some predecessor document (e.g Auto TO creation from TR) or custom program which will automatically create TO in backgroud. Please share the exact requirement

Former Member
0 Kudos

Hi Manish,

We want to have Bin to Bin Transfer.

In short I can say that client want that if on a rack there are Empty Bins at lower level then remove the stock from Top level Bins ( Full Pallet ) and place in the lower level empty Bin.

Thanks,

JK

MANIS
Active Contributor
0 Kudos

Please explore the replenishment process to cover that requirement

Replenishing Fixed Bins in the Warehouse - Warehouse Management Guide - SAP Library

Former Member
0 Kudos

Hello

Another way to create transfer orders from bin to bin using a scheduled job is through transaction LQ01.

Best regads

Carlos Díaz

Former Member
0 Kudos

You change the screen variant of movement type 999 via configuration. By changing the screen variant you will be able to process more than one line. But i am not sure if it will work with LT01. In movement type configuration you can change the screen variant,there are 3 options as i remember. For 999 movement type it is one item by default setting. Maybe you can copy 999 and create another movement and change it accordingly.