My req is, whenever user tries to create a po in ME21N,when he entered the plant in which the material is not present, still system is allowing to create po, how to revert this, please suggest solution, searched in google i didnt get any sloution.
i wonder what bad systems you guys have. If I try to enter a material in a PO which is not created for the plant that I had entered in the same line, then I get error message M3351 immediately in the status line. I do not even need to click the check button.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
No. System will never allow that. System will through a message Material & not maintained in plant &. Message no. M3351.
And you can't make the message as warning. Its an error message by hard coded.
Can you post a screen shot of ME21N and MM60 with plant.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It is nothing related to your initial discussion..
You have extended the material to the plant 1200 that's because system is allowing to create PO.
If you do not want to make the assignment of Pur Org 1100 and plant 1200 in PO, then you should remove the assignment of Pur Org 1100 and plant 1200.
Or to not create PO for the material with regards to the plant, you can set deletion flag or block the material for the particular plant.