APO Graphical planning board - scheduling of dependent orders

Hi,

I set the "pp planning procedure" 3 (cover dependent requirements immediately) for all the semi-finished products in the product master (APO).

When scheduling pl order of end product in the detailed scheduling planning board the dependent planned orders for all semi-finished products are rescheduled as well only if I schedule the pl order of end product backwards (heuristic or drag&drop).

But if I move the pl order of end product forward all the dependent pl orders of semi-finished products will not be rescheduled accordingly = remain in the same place

Question: What parameters shall I set so the system will reschedule the dependent planned orders if I move the planned order of end product forward?

thanks for all useful hints!!!

best regards,

Pilvi

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 20, 2014 at 09:08 PM

    Hello Pilvi,

    Please check in your strategy profile if Order Internal relation ship and Cross Order are always considered (tab strategy param. for dependent objects).

    Also in the pegging section check the box Consider Resource Network.

    Thanks.

    Regards, Marius

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Subhash,

      I set the parameters as suggested but it still doesn't work. When I move the pl order for the end product forward the dependng pl orders for semi-finished products remail in the same place. the same problem with operations in one pl order: e.g. when I move operation 30 forward the operations 10&20 remain in the same place, or if I move operation 30 backward all the operation 40 and up won't move.

      Any suggestions what else I should alter to make this work?

      and thanks again to both of you for your help!

      I appreciate it!

      best regards,

      Pilvi

  • Posted on Nov 27, 2014 at 08:40 PM

    As you can see I set the parameters as suggested but it still doesn't work. When I move the pl order for the end product forward the dependng pl orders for semi-finished products remail in the same place. the same problem with operations in one pl order: e.g. when I move operation 30 forward the operations 10&20 remain in the same place, or if I move operation 30 backward all the operation 40 and up won't move.

    Any suggestions what else I should alter to make this work?

    and thanks again to both of you for your help!

    I appreciate it!

    best regards,

    Pilvi


    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.