Manually Re-transfer the PR

Former Member
0 Kudos

HI,

I am working in SRM 7.02 and ECC6 .

I want to re-transfer the PR that is in Pending status.

I have checked there is no XML generated for the same. So i need to push the PR to SRM manually or some otherway to send the PR to SRM.

Is that is possible?? how??

Kindly help me on it.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member190689
Contributor
0 Kudos

Hello Tamil kanda,

     Run the report BBP_EXTREQ_TRANSFER with input value as the PR number and execute the report. If the PR is present in the EPRTRANS table. only those PR can be transferred to the SRM through the above mentioned report. Run that report in ECC side.

BR

Gaurav Gautam

Former Member
0 Kudos

Dear Gaurav,

Thanks for the response.

We are using PI to transfer thr' BADI not thru' RFC .

In this case, how we can re-transfer the PR.

Thanks