on 10-14-2014 7:11 AM
HI,
I am working in SRM 7.02 and ECC6 .
I want to re-transfer the PR that is in Pending status.
I have checked there is no XML generated for the same. So i need to push the PR to SRM manually or some otherway to send the PR to SRM.
Is that is possible?? how??
Kindly help me on it.
Hello Tamil kanda,
Run the report BBP_EXTREQ_TRANSFER with input value as the PR number and execute the report. If the PR is present in the EPRTRANS table. only those PR can be transferred to the SRM through the above mentioned report. Run that report in ECC side.
BR
Gaurav Gautam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.