Skip to Content
0
Former Member
Oct 13, 2014 at 03:57 PM

Pie Charts Issue

56 Views


Hello,

I had reading a post called ''Pie Chart with two measure in BO XI 3.1'', and I tried to solve my problem with the sugestion in that post, but didn't solve my issue.

I send in attached the images about what I'm trying to doing, I already tried chage the position of table, simplificated the table, take the formulas and nothing of this worked. I can construct with the same data a 'Bar Chart', but for some reason I can't not construct a Pie Chart because the pie chart only consider one of the two values.

Besides od this the data came from two formulas that I send below.

=Count([Pr Id]) Where ([Chk Ccb Subject]Between(1;1))

=Count([Pr Id]) Where ([Emergency Fix]Between(1;1))

I hope someone can help me to solve this issue.

Thank you

Neuza Sousa

Attachments

Capture3.PNG (3.2 kB)
Capture.PNG (2.5 kB)
Capture 1.PNG (3.3 kB)