Hello Experts,
I’m trying to set ou PLM 7 Engineering Record, but not everything is working as expected.
I have set up in customizing, that the system should create a Change Number when changing the status to 20 but nothing happened.
Can you tell me what is missing?
I although tried to link a document to the Engineering Record. I know, some customizing at the document type is missing. I know I have to add the link type /PLMB/ECR. But I don’t know the screen number.
Can you tell me?
Thanks for your help
Regards
Thomas