testing with strategy 11 for run MRP,

Dear,

I am testing with strategy 11 for run MRP, but after MRP run system is considering stock , as as per 11 strategy system should create planned order independent of stock. Is there any config setting.Kindly suggest ASAP

Regards,

Shiv Kumar

11 strategy.JPG (61.8 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Oct 01, 2014 at 09:39 AM

    Hi,

    If you use strategy 11 your PIR requirement type should be BSF...

    in the screen shot you shared PIR requirement type is LSF.. delete the existing requirement and place new requirement through MD61 and check..

    Please check the below link..

    Make to Stock Strategies - Strategy 11

    Thanks

    Kumar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 01, 2014 at 09:47 AM

    Hello Shiv,

    Check stratgey 11,Change req type to BSF instead of Req type LSF .

    Regards,


    test.png (9.6 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.