QM in process inspection sample size

Hi,

    I am using 03 inspection type with multiple operations being inspection relevant in the same prod order. These MICs have an AQL and thus a sample size gets calculated. However if the production order qty decreases due to scrapping, then the sample size for the succeding operations does not reduce automatically. How can I acheive that ?

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Sep 29, 2014 at 12:36 AM

    'The production order qty decreases due to scrapping'?

    I think you are talking about GR(=delivered) quantity from production order.

    The '03' inspection lot is basically created on release of production order.

    At the same time the sample size is also calculated automaitcally.

    Only '04' inspection lot can calculate the sample size based on GR quantity.

    Anyway.. if you can operate it manually,

    -Delete old inspection lot from production order (function > inspection lot > delete)

    -Change the total quantity on production order and create new inspection lot (in same menu)