on 09-25-2014 6:39 AM
Hello,
I am facing problem while using the Inspection by configuration. During COHV when user releases the production order, then system creates inspection lot even there is no QM operation assigned. But as i have used Inspection by configuration setting in material master so definitely system will assign the MIC in last PP related operation and generates the inspection lot.
Now, i need some exit or workaround so that i will skip the inspection lot creation step if no QM operation is there. system will generate only when QM operation assigned in PP order via COHV. CO01 it's working fine as already one exit is implemented but while using COHV, this exit fails and allow inspection lot creation even though there is no QM operation.
Regards
The customer exit QAAT0001 will work for your requirement.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.