Skip to Content
avatar image
Former Member

Send PI SLD DATA into Solman system

Hi ,

I want to send my SAP PI sld data to solution manager. In SLD data supplier already setting for other systems sld.

I added one SLD using Data Supplier for Solution manager. Now I am unable to perform further .

How can I send my PI data to solution manager?

Please help.

Thanks and Regards

Amit Dwivedi

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

6 Answers

  • avatar image
    Former Member
    Sep 25, 2014 at 07:51 AM

    Thanks to Everyone for their support.

    Now I will  upgrade my Solution Manager to 7.1 first.

    Regards

    Amit

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 22, 2014 at 02:25 PM

    Hi,

    May be this helps,

    Configuring the SLD Bridge - System Landscape Directory - SAP Library

      1.  Choose Administration → Data Suppliers.

      2.  If you want the SLD data supplier bridge to forward system data that is received from data suppliers to the default sld/active namespace of this SLD server, set the Update Local Namespaces parameter forsld/active to true.

      3.  Choose Administration → Profile.

      4.  From the Sectiondropdown box, select datasupplier.

      5.  Enter SAP gateway host and gateway service.


      6.  If you want the SLD bridge to send data to multiple SLD servers, choose Administration → Data Suppliers →Add SLD.

      7.  Enter the URL and logon data of the SLD server you want to add and choose Save.

    regards

    Vagesan


    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Thanks Vagesan for update

      We have PI 7.1 EHP1 and Solman 7.0.

      I am adding SLD in my PI test system as I want to send my PI test system information to Solman.

      I have added SLD using data supplier in PI test system.After this phase I am stuck , as How to trigger this SLD information in my solution manager?

      Regards

      Amit

  • Sep 22, 2014 at 02:33 PM

    Hi Amit,

    You will have to follow procedure described in SAP Note 1631346 to push your PI domain data to Solman SLD. Though this has to be followed when you configure PI monitoring in Solman, you can still use this method to push PI domain data to SLD.

    Hope this helps.

    Regards,

    Shahid Ahmed

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 22, 2014 at 03:51 PM

    Hi Amit,

    Are you trying to use the SLD attached to your PI system as your central SLD, with all your systems reporting to it, or are you just trying to get your PI system data into the SLD attached to your SolMan system? In other words, which SLD do you intend to be the source for the LMDB/SMSY landscape data inside SolMan?

    Regards,

    Matt

    Add comment
    10|10000 characters needed characters exceeded

    • Your SolMan SLD is not capable of receiving synchronized data from other SLDs, because it is too old of a version. There's not much you can do about that; even upgrading SolMan to 7.1 will still keep your SLD at 7.01. However, it is capable of being a source system for other, higher-level SLDs (i.e., your PI SLD) that can pull the data in a synchronization job. So, you will definitely want to configure all your systems to push data to SolMan SLD, and then have your PI DEV SLD pull data from SolMan SLD.

      Or, alternatively, abandon your SolMan SLD and configure SolMan to use your PI SLD instead. This might be a better long-term option, except in this case you wouldn't want your SLD on a DEV system, as it needs to have high availability for the rest of your landscape. A PI production system could be a good choice.

      Still, in the meantime, from your PI Test system, the configuration is done from NetWeaver Administrator, which you access from a browser via https://<host>:<https port>/nwa. Once in, navigate to Configuration -> Infrastructure -> SLD Data Supplier Configuration. Here you can see the current configuration and status of the last send job. You can't directly configure it here, but there is a link near the top, where it states For help with configuration, click here. Clicking that "here" link gives some good documentation on how to configure it.

      Full details are also found in this document. Go to chapter 2.2, "Gather SLD Content - Configure the Self-Registration of a Technical System."

      Regards,

      Matt

  • avatar image
    Former Member
    Sep 23, 2014 at 05:45 PM

    Hi,

    Here I describe the issue and requirement in detail.

    We have PI system DEV and TST 7.1 EHP1 , Solman 7.0.

    I just want to send my PI TST  in SOLMAN for MOPZ as I already did for ABAP stack.

    Now want to send system Info of JAVA stack.

    In PI Test

    NWA ->configuration ->  SLD Data supplier

    to send and collect Data setting are as follows:

    http://PIDEV:50000

    that is configured for PI DEV system.

    So I went to in PI TST SLD

    SLD->Admin->Data Supplier

    Added SLD for SOLMAN

    http://solman:50000

    After this step how to send my PI TST system info to solman.

    Please help.

    thanks and regards

    Amit

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 24, 2014 at 12:41 PM

    Hi Amit,

    May be you refer this wiki link and get your issue fix.

    Solution Manager 7.0 and SLD

    The other imperative point here is, Solman 7.0 is obsolete and you should move to 7.1 asap.

    Once you have this, you can take advantage you SAP support and latest documents to fix such issues.

    Regards,

    Add comment
    10|10000 characters needed characters exceeded