Dear Experts,

Iam using the transaction MR11 for booking.In course of the booking for some purchase order I get the message that the "Cost centre does not exist" ,which is true .But If I look in to this costcentre using KS03,I see the Cost-Centre-Bridge cost centre which is Valid.

When the Cost centre Bridge is Valid for a cost centre,I want the MR11 to book it into this costcentre.

How can I achieve that.

Any help here is appreciated.

Thanks
P

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Please check the vaility in KS02 and so also check the Posting date in MR11

former_member457420
Participant
0 Kudos

Hi Guys,

In my example If I look with KS02 the centre is not valid.In that case I want it to take the Bridge Cost centre,which is valid . Thats My Need here.

Former Member
0 Kudos

Please extend  the validity or please change the posting date in the range of old Validity to post .

Former Member
0 Kudos


Hi,

If I understood you correctly, the answer is please go to KS13 report CSKS table to check the validity period of the cost center. Slect the cost center whihc correct valid date.

Regards,

Ram

former_member457420
Participant
0 Kudos

Hello Ram,

You understood me right.But at what place will I make this change in the MR11 program.Its a Standard Program.

I have debugged the MR11 programm and found that the programm gets the costcentre from the EKKN table.

Former Member
0 Kudos

Hi Arun,

Pls check the purchase order once, Whether u have given any cost center.

Regards,

Ram

former_member457420
Participant
0 Kudos

Yes,in Purchase order Position,there is the cost-centre

Former Member
0 Kudos

Hi Arun,

Check the cost center whether that cost center is valid ot not. if not change the validity date or Change the cost center, Take the help of CO consultant.

Regards,

Ram

former_member457420
Participant
0 Kudos

Thanks Ramakrishna. Will ask the responsible.

Former Member
0 Kudos

Hi,

Please check the cost center validity dates and your posting dates in the MR11.

check and let me know if you need any further help.

Regards,