HANA Live Source System change in SLT

Former Member
0 Kudos

Hi Team,

Our ECC is migrating from SQL to SAP HANA DB. We have decided for N+1 approach for ECC environments.

We already have a HANA Live environment up and running fine. Currently, our HANA Live is connected to SAP ECC using SLT. Where SLT Dev is connected to ECC DEV1; but as a part of N+1 approach, a new ECC Dev has been created which is called ECC Dev3.

Now we need to changes SLT connection from ECC DEV1 to ECC Dev3. Basis will take care of the SLT connection changes and replication.

I would like to know, what is required from HANA Live DB side? on this connection change. Our existing HANA Calc views are pointed with Default schema as

ECC DEV1. Now after changing the source system to ECC DEV1; what is required? Please clarify.

Thanks

San

0 Kudos

Hi San,

How did you resolve the source system change? We also have a similar scenario to change the source system to N+1, without affecting the existing Calculation views.