Skip to Content
author's profile photo Former Member
Former Member

How to delete the delta queue in the ECC

Hi everyone!

After I tryed to save a new Infopackage and I have the error :

(Deltas already loaded for request REQU_41Q82WJLR9AZCE9ZMKQLVG3RG init. selection; no 2. init

Message no. RSM1071

Diagnosis

Deltas have already been loaded for the init. selection of request REQU_41Q82WJLR9AZCE9ZMKQLVG3RG. A second initialization is therefore not possible with these selection conditions.

Procedure

If you want to carry out a new initialization, you have to choose selections that do not overlap.

If you want to repeat the init. for the same selection, you have to delete the delta queue in the source system, and restart the delta process.

As the error says - Deltas have already been loaded for the init. selection.

Can you please give me some links/guids which describes how to delete the delta queue in the source system, and restart the delta process.

thank you, Ron

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Posted on Sep 18, 2014 at 11:41 AM

    Hi,

    Assuming as you need to the reinit for same selections.

    in such case you need to delete old init.

    how to delete init:

    Go to your info pack screen, menu Scheduler--> initialization options for source system--> here you can see the existing init, select init(green) and delete it.

    Later you can trigger your init info pack with selections.

    Thanks


    init.jpg (48.5 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 27, 2014 at 11:43 AM

    Hi

    After deleting the entry from scheduler,you can verify it in source system ECC.

    Check RSA7 entry,The particular Datasource should not be there.

    Thanks,

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 28, 2014 at 02:31 AM

    Hi,

    you already run the init and your are trying the one more init then you got error.

    plelase delete the init request form the info package scheduler mentioned by raman.

    then run the info package with init.

    after deleting the init check the data source in RSA7 and after running the info package check the init in RSA7 for specific data source.

    again the run delta info package check the how many entries in data source in RSA7 same records are transfer to BI psa.

    Thanks,

    Phani.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.