Skip to Content
avatar image
Former Member

How to Implement Dynamic Modification Rule for Material & multiple vendor Combination

Hi Team,

     In dynamic modification rule for Material &  vendor combination, i have maintained material & vendor in Inspection plan at Material Assignments

1.If i purchase same material from different vendors then how to implement ?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Sep 17, 2014 at 06:15 PM

    Hi Balaji,

    If I understood correctly, you can maintain Dynamic Modification Rule at lot level and assign the DMR number also in quality plan. When doing  GRN against PO you will get your requirement.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hello,

      No this is not possible. DMR you apply on inspection plan level , it can't restrict the vendor. No way in stdn SAP for single inspection plan, you do one thing just create two inspection plan for same material , in one inspection plan apply vendor combination along with DMR and in another simple generic plan with no assignment of DMR as well as vendor.

      Regards

  • avatar image
    Former Member
    Sep 17, 2014 at 09:27 PM

    No need to maintain vendor in inspection plan only material assignment is sufficient, you can select DMR at lot level in Quality plan header and assign DMR, when you post GR for material, Quality level is generated for different material vendor Combination as in PO, if you need to create Quality level manually you can create using QDL1

    Thanks

    DD

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Balaji,

      In standard SAP, using one inspection plan for multiple business scenarios is not possible.

      If you want same DMR for X and Y vendor and NO DMR for Z vendor then,

      1. Create inspection plan for material A with group counter 1 and Vendor X & Y in material assignment and assign required DMR.

      2. Create inspection plan for material A with group counter 2 and with Vendor Z OR without any assignment.

      Regards,

      Gururaj Kulkarni

  • Sep 18, 2014 at 02:45 PM

    SilverShailendra Gaur  gave you the correct answer.  Most of the additional replies after that are pretty much the same answer, maybe with minor variations.

    Craig

    Add comment
    10|10000 characters needed characters exceeded