on 01-24-2017 3:22 PM
Hi Friends,
Env- BPC 10.1 NW
We have few basic controls that are configured in the system like Trail balance check, Balance sheet check etc. Most of them are warning checks.
Business is asking is there a way that we can automate the controls monitor execution, through a DM package and the results (or mismatches) to be sent to the business instead of they logging in to execute the controls one by one after every load.
Usually the close process at the client takes longer than usual 5 business days. and the loads to bpc are run quite frequently as its a global business.
Any recommendations are highly appreciated.
Ed.
Hi,
The controls cannot be scheduled. They have to be executed on an ad-hoc basis, from the system. The results can be viewed only on the system.
Hope this helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Vadim for your reply.
I tried running the validation package link, which in turn is connected to the validation.lgf.
*RUN_PROGRAM VALIDATION
CATEGORY = %CATEGORY_SET%
CURRENCY = %XXXXXX_SET% - filled in my dimensions
TID_RA=%TIME_SET%
OTHER=[ENTITY=%XXXXXX_SET%]
*ENDRUN_PROGRAM
I get errors "RUN_LOGIC:Business rules are not available"
checked this note 1773600 - Error 'RUN_LOGIC: Business rules are not available' - BPC
Admin - New sdn does not send me email alerts when a post is being replied to., is there a setting that i need to check.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What about *RUN_PROGRAM VALIDATION
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.