scheduling multimixed resources in DS board

Hi Gurus,

We have a scenarios where need your inputs .

1. One Material 12345 will run in two resources RES010, & RES020.

2. Combinations of resource RES010 & RES020 is 100% capacity.

3. IF lot size is 400 kg then RES010 and if Lotsizes is 600 kg then RES020.

4. Two different recipes based on lot sizes.

Now if i wanted to have finite scheduling done how do i need to proceed with approach.

RES010 + RES020 =100%.

Please let me know it will be helpful

Thanks in Advance

Regards,

Rajesh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Sep 09, 2014 at 03:54 AM

    Hi Rajesh,

    What do you mean by res10+Res20 100% capacity.   What is working times of resource 10 and resource 020?

    You would define capacity in hours  for res10 and Res20? Are these resources physically joined. I mean either both of them will be working at same time and will be not working n same time.

    Regards,

    Santosh


    Add comment
    10|10000 characters needed characters exceeded

    • Hi Santosh,

      Thanks for your response. In a room we have two machines and based on lot sizes shop floore team operates machines. RES010 can produce if the lot is 400KG and if lot size is 600KG then Machine RES020 will be running.

      Business wanted to have one RES123 for scheduling which shows all together capacity RES010 & RES020 to have finite scheduling.

      Please it will be helpful if any ideas will be given

      Thanks & Regards,

      Rajesh