Hi
I'm new with QM module and I have to work with QM Certificates. I've created the delivery and now I have my inspection lot, but this has the status CRTD.
I've created the inspection plan as 06 and released, I'm using the inspection type 10, also in the QM10 I assigned the inspection type and the inspection lot origin as 10. I don't know what is missing here.
Thank you in advance.
Sorry for not catching this sooner. This is a repetitive question and has been asked many times. Please search before posting.
For those replying to these posts, please consider reporting similar posts.
Anand Rao 's Wiki article on this can resolve the issue. If people still have questions, they can post after reading it. Hopefully with information ruling out all the issues brought up in the article.
Inspection lots with CRTD status- Causes and Remedies - Product Lifecycle Management - SCN Wiki
Thanks!
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Saly,
Check the Plan Usage and Validity of Inspection Plan.
If you have multiple inspection plans system would not able to pick any plan for which you need to assign manually, You can to Change lot QA02 and Assign the Plan and Sample after above changes.
Br
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.