Hi experts,

I face the following problem.
We booked some batches with 101 and there we got an inspection lot.

After that, we moved the batches with 309 to a new batch.

But the thing is, that the inspection is still refering to the old batch.

Is there a possibility to change the batch in the isnpection lot or book the inspection lot to another one?

Thank you

Accepted Solutions (1)

Accepted Solutions (1)

anand_rao3
Active Contributor
0 Kudos

Possibly not! This information is flown to inspection lot from material document through which the lot was created. If the material document was wrongly created, you can reverse the same and create new one with required batch number.

However if you want to find to which batch the stock was transferred with respect to inspection lot you can do so by developing custom report using QAMB anf MSEG tables

Answers (1)

Answers (1)

former_member221025
Active Contributor
0 Kudos

Hi Christian,

Batch number can not be changed for an Inspection lot. It will always refer the batch which was created at the time of inspection lot creation.

How did you do 309 movement here? system will not allow to move stock from QI using MM Transactions. Is it Stock Irrelevant inspection lot?

In case, Inspection lot is stock relevant  you could reverse 309 movement and Post stock from Quality to "New Material", Specify new batch and Post.

Now, in QA32 you will get this new batch under "Posted to Batch" column.

Amol.

Private_Member_19084
Active Contributor
0 Kudos

Hi Arnol,

thx for the answer. You are completly right.
I found out now, that the part was booked to unrestrcited use, therefore it was working.

Especailly in UR-use the Inspection lot will not be transferred.

I will cancel everything now, thx for help