Hi Experts!

I need help with an error that is being presented today at MRSS when I want to assign an operation to any of the resources the system is throwing the message:  DEMAND CONTROL KEY XXXXXX does not allow capacitive planning.

have not made configuration changes is why I do not understand that may be failing....

Regards!

Damy

Accepted Solutions (1)

Accepted Solutions (1)

damy_vidal
Participant
0 Kudos

Hi Pete & Rakesh:

Thanks for responding, I commented that the control keys are as you indicate me in the picture despite this error still occurs.

Deputy images:

In the transaction /MRSS/PLBOORG the error code is /MRSS/SGE087

What other settings can look. 

Thanks

Regards!

Damy

rakesh_mane
Active Contributor
0 Kudos

Hello

After Commenting the control keys request to you create new set of  work orders and try to work on MRS only newly created work Orders.

Old work Orders may throw same error message as you used that Control Key without commenting changes.

Br

Rakesh

damy_vidal
Participant
0 Kudos

Hi Rakesh:

thank you very much for responding effectively create new orders and they no longer have the error.

Regards!

Damy

Answers (3)

Answers (3)

peter_atkin
Active Contributor
0 Kudos

Damy

Have a look at the ZPM2 control key settings and determine whether they should have capacity requirement flag set (see image below).

If it should not be set, then exclude these operations from MRS.

PeteA

rakesh_mane
Active Contributor
0 Kudos

Hello

It seems to Operation having the Z-control key assigned.Please check The Parameter for Z Control Key might that control key play as External Service Role.

Br

Rakesh

rakesh_mane
Active Contributor
0 Kudos

Hello

Please provide the message number with full description.

Br

Rakesh