Factory Calendar (Automatic Transport Request)

I would like to make changes to the factory calendar automatically request a transport.

Does anyone know if this is possible?

In transaction SCC4 Automatic recording of changes is set.

In IMG Activity, object SCAL is set to 2 Automatic transport

When changes to factory calendars are made, it only warns that customizing changes are not automatically recorded.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Dec 10, 2005 at 02:55 AM

    It is by design that factory calendars or any maintainable calender is NOT transportable.

    Regards,

    Rich Heilman

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 10, 2005 at 10:17 AM

    Factory calendar can be changed in Development. This wont create any transport request number. If u need the same changes in other systems, this needs to be manually changed in those systems. There will not be any transport rquest generated as such.

    Pl. award appropriate points if useful.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.