Skip to Content
avatar image
Former Member

EHP 7 Upgrade components/add-on level

Hi Everyone,

I am working on EHP 7 upgrade on my ECC 6 EHP 6 system. I got confissed with the component details shown during the Configuration phase of SUM tool. My current SAP_APPL version is 606, Level 3. so i understand that my System is at EHP 6 and the SPS is 3. but in the SUM tool, the target SAP_APPL shows as 617 Patch level 4 and few other components also showing as 617.  is it the right target lelvel for an EHP 7 SPS 4 upgrade?

in the MOPZ i chose only EHP 7 SPS 04.

also, during the add-on selection stage in SUM tool at Configuration phase, it suggested to change BP-ERP(current version 604V5), BP-SOLBLD(current version 70V3) add-ons target version. i thought i can keep the current version by giving "vendor key for KEEP decision"  and i gave the key for it. but wondering if this add-on should be upgraded, it should have been included in the mopz itself, rather than poping up durin gthe actual upgrade. I could not even find these add-ons listed in PAM to check whether or not it will support 7.41 components

Can someone please help me understand this?

Thanks,

Shiv

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    Aug 13, 2014 at 10:07 AM

    Hi Shiv,

    If you have confusions, you don't reply on MOPZ then goto SMP and check there.

    For eg. navigate to Support Packages and Patches - E" SAP ERP" SAP ERP ENHANCE PACKAGE" EHP7 FOR SAP ERP 6.0" Entry by Component" Financial Supply Chain Mgmt

    and check for SAP_APPL. you will find 617.

    Divyanshu

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 13, 2014 at 10:46 AM

    Hello

    so i understand that my System is at EHP 6 and the SPS is 3. but in the SUM tool, the target SAP_APPL shows as 617 Patch level 4 and few other components also showing as 617.  is it the right target lelvel for an EHP 7 SPS 4 upgrade?

    Correct. 617 is for EHP7

    For BP-SOLBLD read this SAP note.

    1301301 - Release Strategy for SAP Best Practices Package ABAP Add-ons

    Regards

    RB

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 13, 2014 at 09:52 AM

    Hi Shiv

    If you are configured Solution Manager with MOPZ its very way, otherwise painful process.

    check this SAP Note
    1737650 - EHP7 for SAP ERP 6.0 SP Stacks - Release & Information Note


    BR

    SS

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi SS,


      as already said,, i have selected the EHP SPS thorugh MOPZ only. My quesion is different. can you please check it once again for me?

      Thanks,

      Shiv

  • avatar image
    Former Member
    Nov 16, 2014 at 01:00 PM

    Hello Shiv,

    Did you find any solution for your problem. I am also in same situation. I have just completed SUM upgrade of EHP7. I have included HR Renewal 2.0 while generating mopz. But after upgrade SAP HR is still 604 and EA HR is 607.

    Let me know as how to bring it to HR 608. How did you solve it.

    Thanks,

    Srikanth

    Add comment
    10|10000 characters needed characters exceeded

    • Hi Dieter,

      This is a separate problem from that discussed in this old thread. I strongly suggest opening it as a new discussion.

      By the way, I am experiencing the same problem and looking for a solution.

      Cheers,

      Matt