Skip to Content
author's profile photo Former Member
Former Member

Question regarding modification to BAPI interface

Hi,

I have already a running setup of a file to RFC scenario which is working fine,but i I modify the BAPI interface,do I need to import the BAPI again into the XI.

Please clarify.

Best Regards,

Arun

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 08, 2005 at 02:24 PM

    Arun,

    If any of your input / output structures that you are using in IR, then you need to.

    Regards,

    Ravi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 08, 2005 at 02:15 PM

    Hi Arun,

    If the modification affects the BAPI structure then YES, you need to import again.

    Regards

    Vishnu

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 08, 2005 at 03:05 PM

    Hi Arun,

    If you do some changes in BAPI in Integration repository, you have to import it once again.

    Regards

    sirish

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.