Hello All,

We are planning to do upgrade CE 7.2 SP5 to CE 7.3 latest patch.I am new to CE and i need to give the estimation and the steps.

I need your help to understand the upgrade process.

We are using MDM Java  API 7.1 sp 06, MDM WDC, BPM,web dynpro java...

I dont understand how to start...I need a check list / suggestions / precautions / Pre and post configurations while doing upgrade.

Please guide me how to start the upgrade and how much time it will take as i need to give estimation to cilent.

Thanks

Aditi

Accepted Solutions (1)

Accepted Solutions (1)

pradeep_kumar5
Active Participant
0 Kudos

Hi Aditi,

Below are the few things to be noted.

#1. Identify the version/SP level in NW 7.3 & SAP JVM

#2. Run through UDA (Upgrade Dependency Analyzer) to get high level idea on the supported system

#3. Check for DB & OS support

#4. Check for browser support & compatibility

#5. Check for benefits that you are going to get specifically for your application (BPM/MDM-WD/WDJ)

#6. Plugin for WDC for 7.3 should be installed (I am pretty sure this will be taken care of by Basis/Admin team)

#7. All existing BPM processes in CE 7.2 should be completed. After the upgrade they will be lost.

#8. Also check if Portal Theme and screens are loading properly in case Federation is being used

#9. All the custom Java Application Parameters need to be reconfigured after the upgrade.

#10.You are using MDM-WD components, so please check for the SCA required and if there are any known issues.

There should not be much differences if you are using only these application which you mentioned. However,  There must be a round of testing done in Dev/Quality environments after upgrading them. If all the applications run good in test environments, it will work in prod too. All the components of BPM/MDM/WDJava and WDC Components developed in 7.2 works on 7.3 as well.

-Pradeep

0 Kudos

Thanks a lot  Pradeep.

Need more information as i am doing upgrade first time.

I search For upgrade Guide also but didnt get it on SDN.

what is backup strategy in case of NWDI, BPM ,WDJ,EJB and MDM component before doing upgrade?

As far i know Latest SCa file will contain all my web dynpro component ,EJB.

what is your thought if i upgrade CE 7.2 to CE 7.4? Please Suggest.

Also share your Experience about the efforts how much time it took for CE upgrade?

Thanks You

Aditi

Answers (3)

Answers (3)

former_member191643
Active Contributor
0 Kudos

Check the documentation here once in the Upgrade Guide section.

0 Kudos

Hello Praddep and Amey

Thanks alot for your reply.

I need some more information in short step by step guide.I have gone through Master Guide But i was not able to understand.

and therefore i want step by step process.

1.Basis Team Steps (SUM Tool)

2. CE Team Steps (NWDS installation, NWDI track import ,web dynpro component,MDM ,VC and BPM)

Regards,

Aditi

former_member197472
Active Participant
0 Kudos


First of all there are no much changes in 7.2 to 7.3

We did the same upgrade last year. So no WD code change is there.

Efforts will be from Basis team. * Just make sure they take backups of db,code and ume database as well (before upgrading)

Estimates -

Basis Teams estimate for upgrade(for each system)

+

Your testing all apps efforts (for each environment)

+

Buffer PDs for code fix if in case (you may require this in UI fixes .. again not compulsary*)

+

Prefered Upgrade order

one Non-Dev system(eg INT or training) -> Dev -> 2nd Non dev like Stage -> Production

+

Hypercare after Upgrade in Prod(7-10 days as required)