on 08-01-2014 12:09 PM
Hi All,
We are seeing an issue with the ATP checking horizon in APO. As per my understanding, the Material master Integration Model should update the ATP checking horizon with the Total replenishment lead time for an in-house product.
In our case, if I change the ATP checking horizon manually in APO to a different value, after running the Material Master Integration model, I do not see the ECC replenishment lead time in APO. I have checked and the material does exist in the active IM and there are no CIF issues encountered.
Shouldn't the IM overwrite the manually entered value in APO with the ECC value for replenishment lead time?
Regards
Hello PN 01 ( Not sure if this is your name ),
Which program have you run ?
In case if you had run RIMODINI, my expectation is that it should overwrite the value. But, if you have regenerated the IM with RIMODGEN followed by RIMODAC / RIMODAC2, then I doubt it updates the APO product master.
Babu Kilari
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.