Hi
I am looking for help with QIE and sampling processes.
During the Goods Receipt in EWM, I am trying to set up an inspection rule which will allow me to perform the GR and then take the physical sample. I am using detailed inspection plans in ECC system and maintaining my sample drawing procedures and sampling procedures in the ECC system.
I want to pull the right number and quantity of physical samples from the ECC inspection plans and have the sample pull documented correctly in EWM.
If anyone could provide feedback, I would appreciate it.
Thanks, Lori