Skip to Content
author's profile photo Former Member
Former Member

Message Cost Center doesn't exist

Hello,

When I look into the AFBP I see that there was one Run with an error. It says that the cost center doesn't exist at 31.05.2014. Message number: KI222

The cost center exists and is also valid. It also says that the cost accounting circle KORE has been automatically determined from the accounting area.

What coult be the problem? I'm not very good at solving problems at the sector accountancy 'cause I wasn't trained that until now.

lg Carmen

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 24, 2014 at 12:32 PM

    Hi Carmen,

    Please check whether cost center is assigned in Time dependent tab of Asset master.

    Bye...

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 24, 2014 at 12:42 PM

    HI ,

    Can you Please check Cost centre is block in Control tab .

    Many Thanks

    Regards]


    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 24, 2014 at 02:30 PM
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.