Skip to Content

Can PR be transferred to SRM without PI in V7.x ?

HI, experts

RT, could we realize the transferring PR from ECC to SRM without PI in SRM version 7.x? , if can, how to do ?

thanks

Jesse.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jul 23, 2014 at 08:29 AM

    Sure,

    just follow the steps in the config guides. Schedule BBP_EXTREQ_TRANSFER and you are set.

    Regards,

    Robin

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 24, 2014 at 05:57 AM

    Hi Jesse,

    PR and PO both can be transferred to the SAP ECC backend through RFC and hence PI is not necessary. It is only if you need SRM to connect to non-SAP systems (& SAP systems like SUS), you require PI.

    Please set-up an RFC connection in SM59, job(as mentioned by Robin) and the other settings like n umber ranges, transaction types and back-end document types you should be good to go.

    Hope this helps 😊

    Cheers,

    Yateesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.