Material stock out - For planned orders

Gurus,

I am currently trying to create a flow for Material stock out report based on Process orders and Planned orders (at component level)

Using 2LIS_04_P_COMP, I try to enhance and include RESB-VMENG to get the Qty for Availability value and the use below logic to get stockout

Stock out: “Qty for Availability” – “Required Qty” is negative, then “Stock out”


For PLanned orders, RESB-VMENG is not filled. So, the question is:


How do I calculate Stock out for planned orders. ?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 23, 2014 at 08:04 AM

    Gurus,

    Please respond !!

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Kalpana

      Thanks for responding to my request. I am not a PP expert here..All I need to understand a logic on how to bring the stock out calculation in to BW.

      How do I make a difference between Stock out in Production order with Planned orders ?

      Would appreciate if you can describe the answer with tables

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.