change order of the super routing

hi,

i,m trying to change the order of the operations in the super routing, i´ve created a characteristic with the table name PLPOD and field name VORNR, to try to do this, and then I assigned the characteristic to the class, then with the transaction CU01, I created and edit the dependency and finally assigned the dependency to the routing, like this, $self.OPERATION = '0030' if $root.COLOR = '01' , The opertaion of the color 01 is 0010, i,m trying to change the order of the operation, but doesn´t work, i don,t know if that will be possible.

thanks!!

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Jul 22, 2014 at 12:32 PM

    Francisco Fesser,

    The reason may be table-field conbination you targetd are not allolwed changing using dependencies.

    Its posisble to change master data using dependecnies , but not all fields of routing, BOM sales order etc can be change through it.

    For routings only below fileds can be chaged PLPOD (task list and master recipe)

    - Activity types
    (LAR0106)

    - Standard values
    (VGW0106)

    - Unit of measure
    (VGE0106)

    - Work center (ARBPL)

    -
    Operation description (LTXA1, LTXA2)

    For more informatuon on allowed table and fileds refer link. https://service.sap.com/sap/support/notes/935885

    Thanks

    Ritesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.