SAP REX 3.2 - Calendar timeslot from 15 to 5 minutes

Dear Colleagues,

i am working on REX 3.2, i have a requirement to change the calendar timeslot during the visit creation. By standard the timeslot is 15 minutes, the requirment is to have a timeslot of 5 minutes.

thanks a lot.

Regards

PAS

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 25, 2014 at 08:04 AM

    Hi Pasquale,

    We don't offer a configuration that can reduce the time slot. It can be achieved only by custom code.

    Regards,

    Harsha

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.