Issue with Deconsolidation

Hi,

I am not being able to create Deconsolidation WT automatically after goods receipt. Here is the scenario -

I have product 3000 and 4000. Product 3000 has PACI has LVL3 while Product 4000 has PACI as LVL1. Both the products 3000 and 4000 are going to same high rack storage (T001) but 4000 stays on Level 1 with bigger pallet and 3000 goes to level 3 with smaller pallet.

All the bins for Storage Type T001 are assigned to the activity area T001.

My warehouse is POSC controlled and the placement process is combined of IB01 + IB02 + IB03 ( IB01 = Unloading, IB02 = Deconsolidation, IB03 = Putaway).

My packing is single level. My requirement is - when a mix Pallet arrives with product 3000 and 4000, after unloading and goods receipt from GR-Zone, WT should be created towards Deconsolidation Storage type (DCON). It's not happening, instead system trying to search for putaway towards final Storage type T001.

I have attached the screenshot for 'Define attributes for Deconsolidation'

Please let me know, if I am missing something.

Thanks,

Amit

Capture 1.JPG (33.6 kB)
Capture 2.JPG (41.9 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Jul 17, 2014 at 09:54 PM

    Hi Amit

    If u have same activity area then keep different decon group under customization and do sorting before any put away.

    Basic rule for deocn is different activity area and different consolidation group per product in one HU.

    And in this case also u can achieve same. make two activity area under one storage type and also consolidation group, grouping bins as per your physical levels and there grouping.

    Now in your below screen flag product/ flag to get auto and deocn rule consideration.

    Then make stoarge process defination for IB02 as rule based and make all setting update at customization and easy excess for work center.

    Now in your case system will start finding bin for product and when it check it has different consolidation group then after IB01 system will make IB02 task for deconsolidation and then make iB03 task will become active.

    Hope to get your issue resolved.

    Regards

    Suraj


    pastedImage_0.png (56.9 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 18, 2014 at 02:37 AM

    Hi Amit,

    Check the activity area and consolidation group. spro>masterdata>activity areas>activities>assign storage bins to activity areas.


    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.