Background GATP based on LOAD Scheduling Step

22 Views

Dear all,

We work with an integrated solution between ECC and APO.

During the sales Order entry, the system triggers a Background GATP in order to calculate a first MAD Date.

It seems that during this Background GATP the system doesn't read on APO side the Load Scheduling step based on the Start Location and The Means of Transport. From the condition analysis, I noticed that the system doesn't read the field Means of Transport.

The only way that I found to solve this issue was to map in the APO Customizing ( GATP => Transportation and Shipment Scheduling => Interfaces => Define assignment of Default Means of Transport to Shipping Conditions) The shipping condition to the means of Transport but this is only a one to one relation meaning that I cannot assign several MoT to the same Means of Transport.

Do you have any idea how can I try to manage that issue?

Thanks in advance for your input.