Skip to Content
A B

Import of SWCV - Transport Failed

Hi,

We wanted to copy our existing prod system and build a new pi box.

In order to avoid risk, we made a copy of test box into new pi box. Then we copied the production sld into new pi box sld .

Now we imported the SWCV from production system and trying to import into new pi box.

We had the following errors.

Attempt to access content of zipped transport file failed

We checked the .tpz file and manually tried unzipping which was successful. So there are no issues with that. Further analysing the log, it said the following

invalid entry size (expected 465020 but got 464985

bytes)

Is this anything to do with the SLD, we had checked and the SLD also is running. Please note that we have done the transport at SWCV level.

Regards

Sam

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    Jul 08, 2014 at 02:49 PM

    We had copied the tpz files again into the import queue and that worked this time. Thanks for all the replies.

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 08, 2014 at 02:04 PM

    Did you update your test PI box, maybe to a new Version? If so, CIM Model of SLD could be different.

    If not, could there been differences in database? Unicode vs Non-Unicode?

    Cheers

    Jens

    Add comment
    10|10000 characters needed characters exceeded