How to handle defect in material while the production order is already released ?

Former Member
0 Kudos

Hello Experts,

I would like to know the process that,if it is found material is defective while the production is going on and then decision is taken to stop the production then how the process can be mapped in SAP ?

I think the 03 inspection process will take care of this but still can anybody give me exact steps to map this scenario..?

Any help will be highly appreciated by reward points..

Thanks

Anand

Accepted Solutions (0)

Answers (5)

Answers (5)

narnei
Contributor
0 Kudos

Dear Mr.Anand Joshi,

In one way You can confirm the order partially.


or

in other way You need to Reverse the  Raw material back to ware house ( To Scrap Storage location - to do needful on defective RM) by using  MB1A - 262 Movement type with reference to your Order.

Get fresh Raw material  qty issued against your order to fulfill requirement through- ' MB1A  - 261 Movement type.

Also pls try to refer the below Link which will gives you more idea on this issue.


Regards,

N.S.Rao

former_member184574
Active Contributor
0 Kudos

Hi,

If you find the raw material is defective then if you are going to stop the production of that order then follow as mentioned below...

If already components ( raw materials) are issued by 261 movement against the order then return the good raw materials to stores or warehouse by doing 262 movement to warehouse storage location and defective material to scrap location..now close the production order by confirming the operations which are already performed (if any) and then TECO the order..

Hope this helps...

Thanks

Kumar

maheshkumar_komatineni
Active Participant
0 Kudos

Hi Anand,

then you can send back the Materials To the Inventory nad re issue Currect Materials, In MB1A by using 262 Movement type you can send back the raw materials.

regards,

Venkat.

former_member184666
Active Contributor
0 Kudos

Hi Anand,

  1. Activate 03 inspection type for the material in material master -quality view
  2. Assign the relevent inspection characteriscts for each operation in Routing
  3. When order is released, system will genereate the inspection lot.
  4. Based on results recording, if any defects are there trigger Notification (F3) for handing the defect related communications etc.
  5. Do confirmation as applicable - Yield or rework as required.

Thanks & Regards,

Ramagiri

maheshkumar_komatineni
Active Participant
0 Kudos

Hi Anand,

is the Raw material issued for production is defective or In Process Material Is Defective.

Regards,

Venkat.

Former Member
0 Kudos

Hi,

raw material is defective..