Hi All ,

we are loading data into Infocube from datasource ,one process chain for delta init with data transfor  ,which has data selections at infopackage say 06.2014 and other process chain for delta which has same selections at infopackage . Now I want change this data selections  at Infopackage level .

I Have tried to change these dates in data selections at infopackage level , tho I have changed and saved to future date at delta initial with data transfor ,it's keep coming back to 06.2014. Of course data selection at delta Infopackage level is faded .

I Want to set future date with delta int with disturbing delta loads . How to do it please .

regards

hari

Accepted Solutions (1)

Accepted Solutions (1)

RamanKorrapati
Active Contributor
0 Kudos


Hi hari,

Existing info pack selections not possible to change.

if your delta info pack have with selections then you cant change.

You need to run new init  with required/new selections then only your delta will pull records based on new selection.

Thanks

Former Member
0 Kudos

Hi Ram,

thanks for quick reply .

So,basically I need to run new delta int with new selections and  new delta with new selection .

thanks

hari

RamanKorrapati
Active Contributor
0 Kudos

Yes,

Run init without data transfer with required selections.

After that create delta info pack with same selections, so now on new delta will brings records as per the selections.


Former Member
0 Kudos

Hi Ram,

We will  load delta Intial with data transfer every weekend , and we run delta everyday , because we do delta init with data transfer with selections say ( 01.20011 to 12.2003 ) every weekend , hope I need to create new delta infopack  with new data selections say ( 01.2004 to 12.9999) only  to get update data in Infocube.

Please correct me if I am wrong .

Regards

hari

RamanKorrapati
Active Contributor
0 Kudos

Assuming as your info pack selections are 01.2011 to 12.2013.
Yes, you need to create one more init info pack with selections 01.2014 to 12.9999