Former Member
Jul 01, 2014 at 03:20 PM

Days supply shows incorrect results when selection profile is loaded

17 Views

Days of Supply works perfectly in CTM planning book when individual product & location is selected. But, if selection profile is loaded and then drill down to individual product & location happens, "Days of Supply" does not show correct results. We have copied standard macro from 9ACTM02/CTM02(1) Planning Book/DataView. All settings of Days of supply, Determine Workdays are same as standard CTM & SNP macros. I followed all steps used in following thread:

but still selection profile is not giving correct results. There should not be any difference in Days of Supply when individually selected by Product and Location or via selection profile drill down to product & location level. Standard CTM planning book works perfect even when selection profile is loaded. Not sure if I have missed out anything even though I matched all macros and related settings with standard macros. Please advise.