on 06-25-2014 8:25 PM
We need to use outline agreements in APO. We are doing the following:
Problem:
If there are more than single vendors for a material , there is a preferred vendor that needs to be picked by the system. We set the t-lane priorities acc. to preferred vendor and it works fine with heuristic. But for optimizer, we are not able to determine a method for the system to determine the preferred vendor and pick it during optimizer run.
Could you please share your thoughts or best practices regarding above.
Thanks.
Hi Shweta,
Following article should help you out :
http://help.sap.com/saphelp_ewm70/helpdata/en/3b/726b3c7a64e76ce10000000a11402f/content.htm
Regards,
Mukesh Pandey
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shweta,
You can maintain transportation costs in the t-lanes e.g. maintain a lower transportation cost on the t-lane from the preferred vendor and check the results.
Regards,
Umesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shweta,
In addition to the transportation cost, the optimizer will consider the storage and production costs also to arrive at most cost effective proposal. In your scenario, since you are procuring from external vendor, I do not think you will be maintaining the storage and production costs, so by maintaining the transportation costs, you should be able to get proposals from the preferred vendor.
Regards,
Umesh