on 06-25-2014 7:49 AM
Hi All
Route in outbound delivery of ERP is not getting reflected in EWM ODO. I have done below settings in IMG.
Extended Warehouse Management --> Goods Issue Process --> Outbound Delivery --> Route Determination --> Activate or Deactivate Route Determination
DOC TYPE - OUTB
RD/RC Status - 2
RD Sequence - Standard logic
RD ERP - No determination if Route origin is in ERP
Extended Warehouse Management --> Interfaces --> ERP Integration --> Delivery Processing --> Map Routes and Route Schedule from ERP System to EWM
Mapping Route - 2
SCM Basis --> Routing Guide --> General Settings for Route Determination
standard setting
Please help where I missed.
Thanks
Sasidhar Gupta
Hi Sasidhar,
The settings seems fine. Kindly check the following settings also:
Extended Warehouse Management -> Goods Issue Process -> Outbound Delivery -> Route Determination -> Define Scheduling Within Route Determination
In here select the relevant doc type and go to node Date/Time Types. If it asks for work area info, enter the EWM client and details. Check if the following two entry exists: TDELIVERY, TOUTYARD.
Do check under SCM Basis menu if the routing guide is configured.
Also do give it a try with 'Route determination if Route Origin is in ERP'
Regards,
Oritra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Oritra
No need to configure
Extended Warehouse Management -> Goods Issue Process -> Outbound Delivery -> Route Determination -> Define Scheduling Within Route Determination
The correct settings are as I mentioned above with below correction.
Extended Warehouse Management --> Interfaces --> ERP Integration --> Delivery Processing --> Map Routes and Route Schedule from ERP System to EWM
Mapping Route - 1
Thanks
Sasidhar Gupta
Hi Sasidhar,
May I ask you a question? I am trying to configured the TCD function in EWM, I got a very basic question here. Hope you can help on it.
scenarios is from plant A to customer A via plant B, the plant B is cross-docking plant. I set up two direct route:
1. A->B: Plant A to Plant B
2. B-CusA: Plant B to Customer A
And a cross-docking route: A-B-cusA which include above 2 routes. and marked as CD route in EWM.
my question is when I should do the route determination? do I need to do it in ERP, like have the same route A->B and B->CusA in ERP, and allow it copy to ODO in EWM? or I should ignore hte ERP route and just do the EWM route determination?
Can you also list the required configuration for TCD if possible?
Thank you very much,
RK
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.