cancel
Showing results for 
Search instead for 
Did you mean: 

Unable to pick correct quality plan

0 Kudos

Hi all,

Z8 inspection type created (copying 08) and for the same material we have used std. STO inspection type 08.

we have created Z09 movement type (copying 309 movement type). we have done 311 movement type(insp. type 08 activated )

For a material we have activated both 08 and Z8 inspection type,  I have not done any preferred inspection type in the material master

parallelly I have created task list z5 usage  for z8 inspection type and 05 usage for 08 insp. type.

now my requirement is to pick z5 usage quality plan for z09 movement type + z8 inspection type combination

already system is picking 05 usage quality plan for 311 movement type + 08 inspection type combination

how to bridge this gap ?

thanks and regards

SARAVANAKUMAR. P

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42743
Active Contributor
0 Kudos

Both the 309 and 311 material movements have an inspection origin of 08.  So your Z09 movement type will also have an 08 inspection origin.

You have two inspection types (08 and Z8) assigned to the inspection origin.  The problem is that the system, regardless of the movement type, is just looking for an inspection type with an 08 origin.  It will find two.. 08 and Z8.  so it won't know which to take unless one is marked as preferred.

If you want to pick the inspection type, then you would need to use a user exit to do this for you.  Probably user exit  QAAT0001 Inspection type determination different from variant 01.

Craig