I Have a requirment that every saturday is HALF  Day so  how do i configure in the systed i have the below solution pls guide

1) Create  separate DWS for saturday like 9.00am 1.00pm and one more DWS 9.00AM 6.00PM

2 ) Create two counting with two seq number  like

CR-101-

Seq: 001  will check all the boxes in the week day expect saturday & and maitain quota mulipler 100%

CR 101

Seq002   will check only saturday and maintatin quota multipler 50%

whn emplyee for leave we assign the counting rule to each absence  is this process is correct

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Girish,

If its half day for all the Saturday, then define a separate DWS for Saturday and assign it in all the PWS(Saturday). Define WSR and generate it.

Thanks,

Santosh

Former Member
0 Kudos

Thank you santosh   for example like 1st Saturday  and 3rd saturday holiday  day remaining  2nd and 4th satuday is half day  then how do i resolve this issure

vianshu
Active Contributor
0 Kudos

Hi Girish,

Your scenario is of 1st and 3rd saturday as OFF days and 2nd and 4th as half days.

In such a scenario, please do the following.

Create a PWS as shown below:

DDDDDXX

Generate the above WSR and then make changes to the generated one for 2nd and 4th Saturday by replacing X with H where H is half day. You do this using TCode PT02.

Don't generate the WSR again.

Thanks and regards,

Vivek

Former Member
0 Kudos

Hi Girish,

check this document and do the necessary changes for the half day both 2nd and 4th Saturday.

Answers (1)

Answers (1)

vianshu
Active Contributor
0 Kudos

Hi Girish,

Please use a separate DWS for Saturday with reduced timings.

Please refer the below document on Public Holiday Calendar and WSRs which will help you.

I hope this is helpful.