Confirmation of receiving material at Production

kaushal_sharma
Active Participant
0 Kudos

Hi Experts,

I have one requirement from client.

There is automatic reservation against Production order (Mtype: 261). Store will issue the material against the reservation. Material should not go directly to the production order. First Production People will confirm the qty, if less qty. is there he will change and accept that qty.

Please suggest, how to do?

Thankx in advance.

Regards,

Kaushal Sharma

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Kaushal,


Store will issue the material against the reservation.

and


Material should not go directly to the production order.

are a contradiction.  When you issue a reservation against a production order, by definition you are issuing the stock to the production order.

You could have your stores people MOVE the quantities contained in the reservation to an interim storage location.  The interim storage location could be the responsibility of the production people.

Then, the production people could ISSUE whatever quantity they wish to the production order.  If you adopt this process, you also need to consider adopting additional processes:  What does production do when the desired issue quantity is more than the quantity in the interim Sloc, what does production do when the desired issue quantity is less than the quantity in the Interim Sloc; what does production  do when the Interim Sloc contains stock that is not relevant to any reservation; what does production do when the system inventory quantity in the interim Sloc is different from the actual inventory quantity; etc etc.

Best Regards,

DB49

Former Member
0 Kudos

As per mine knowledge i don't think so you can have a quantity confirmation based on reservation created through production order , rather when you issue less quantity against production order you get an error message.

kaushal_sharma
Active Participant
0 Kudos

Client want to issue less qty than reservation qty, but production will confirm whether qty which is in the document is matching or not. If its not matching he can able to change it and post.

Former Member
0 Kudos

If it is reserved against PP order then why you want to issue less quantity, does this helps in order confirmation, does your Order will be completed.