on 06-10-2014 2:44 PM
Dear all,
We are currently on SAP PI 7.1 EhP1 with Netweaver 7.11 SP10.
As a prerequisite fpr an ECC Uprgade to EhP7, SAP says " When using SAP Portal, SAP BW or PI in conjunction with ERP 6.0 EHP7, the underlying Netweaver version of these systems must be NW 7.30 or higher before upgrading to ERP 6.0 EHP7"
Is it possible to upgrade only the NW stack to NW 7.3 or 7.4 without upgrading SAP PI to 7.3 (or SAP portal or SAP BW to the next available version) ?
Thanks and Regards,
Reena
Hello Reena,
The official recommendation from SAP is that the PI system must be on the highest release in the landscape. See note 1043047 Compatibility of XI/PI in the system landscape. So the recommendation is to upgrade your PI first and then upgrade ECC.
However, some customers have successfully upgraded ECC first. Several issues were encountered. These are documented in note 1942289 Known issues with PI and ECC EHP upgrades
Regards
Mark
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We are on the exact same situation and you need to upgrade your complete PI system.
A SAP PI system runs upon a NetWeaver stack, but you need to upgrade everything.
Kind regards,
Dimitri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.