Skip to Content

Physical sample

Hi expert,

Can we bring system control on stock through physical sample lot. If yes then please help me to provide the steps as in our client following is the business scenario and requirement.

Business scenario : Tankers arrives the plant and sampling is been done. If sample is approved then GRN is been done.

Requirement : Can system can block GRN of material against certain PO if sample is rejected ?

Regards,

Sun

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 10, 2014 at 05:35 AM

    You can activate the Quality inspection type in material and then do the GRN IN MIGO for QUality inspection. and when sample lot is approved by Quality then take the stock in unrestricted through mvt type-321.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.