IDoc Configuration in SAP PO Netweaver 7.4, single stack (AEX)

  1. The destination XI_IDOC_DEFAULT_DESTINATION with the connection to ECC system maintained in NWA.
  2. In InboundRA following are maintained in the “properties” tab-
    1. MaxThreadCount = 5
    2. Local = true
    3. Gatewayhost= PI_Gateway_Host
    4. GatwwayService= PI_Gateway_Service
  3. The JCO RFC provider is configured and started.
  4. In ECC , SM59 connection made with same program ID as it is in InboundRA
  5. The gatewayhost and gatewayservice is of ECC system (or) PI System. (Not sure on this Please Suggest).
  6. The IDoc is triggered from WE19. The following error appears in SM58

Error 1: Bean IDOC_INBOUND_ASYNCHRONOUS not found on.

Error 2: As suggested by many colleagues and blogs we removed the JCO RFC Provider and then we got the “Program ID not registered” error in SM59 connection test.

I tried all the suggestions given in the blog http://scn.sap.com/docs/DOC-31398.

Please help me out with some suggestions.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Jun 09, 2014 at 09:30 AM

    In addition to the Question I would again like to point the 2 cases where I get the errors-

    Case 1: The JCo RFC Provider is configured with gateway host and gateway service of ECC system.

                 Here I can see "Program ID registered successfully" in SMGW transaction in ECC system.                  The IDoc is created successfully but shows an the following error in SM58:-

                 "Bean IDOC_INBOUND_ASYNCHRONOUS not found on host"

    Case 2: As per suggestion in the blogs when I remove the JCo RFC Provider. I get the following error              while connection test in ECC SM59:-

                 "Program <ID> not registered".

    Please provide solution based on these 2 cases.

    Thanks and Regards,

    Vikas

    Add comment
    10|10000 characters needed characters exceeded

  • Jun 06, 2014 at 11:10 AM

    Hi Vikas,

    Take a look at Sending and receiving IDOCs using a single stack SAP PO system

    Kind regards,

    Dimitri

    Add comment
    10|10000 characters needed characters exceeded

    • Hi Jannus,

      I did as per your suggestion. When I did the connection test in ECC, I get the following error-

      "ERROR: SAP gateway connection failed. Is SAP gateway started?".


      Do I need to configure and start the JCO RFC Provider? (Many SCN blogs and colleagues have suggested to remove JCO RFC provider).


      In your case did you keep the JCO RFC Provider? If yes do provide its configuration detail as well.


      Thanks & Regards,

      Vikas Kumar Singh

  • avatar image
    Former Member
    Jun 06, 2014 at 11:09 AM
    Add comment