Skip to Content
1
Jun 05, 2014 at 03:21 PM

LIne item deletion -availability

20 Views

Hello Everyone,

I am in a bit of a pickle. I had 2 KAs for a material/serial number combination say 1 and 2. The material has been confirmed in the schedule line

in KA 1 but then BP wanted to bring it in using KA 2 so he assigned a reason for rejection for that line item in KA 1 so he could confirm the schedule line

in KA 2. This didnt work.

Unfortunately I deleted the confirmed schedule line in KA 1 and then deleted the line time itself in KA 1. This didnt result in the material being available for a return with KA 2.

As a result of the above in MMBE the material is still with the customer (KB)(we are using KB and KA for rental process mapping)

but if look at KA 2 availablity check result for the material that qty is still confirmed against KA 1 line item which we deleted.

Please assist in bring the material to available

Regards

Madan Shetty