Skip to Content

Upgrade from SAP PI 7.0 to SAP PI 7.4 dual stack

Hi Experts,

Currently we are on SAP PI 7.0 version, with many ccBPM and abap proxy interfaces.

I intend to upgrade this environment keeping ABAP and JAVA stack for ccBPM and IDocs interfaces.

My question is i can do a system copy on the new PI environment and then upgrade it to the SAP PI 7.4 dual stack ?

Regards

Marco

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jun 04, 2014 at 05:32 PM

    Hi Marco,

    AFAIK - you can copy the system to new PI environment and updrade. Please refer SAP note 1299373 or below doc

    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e0a78af6-1977-2e10-0d81-ca7e9f81b668?quicklink=index&…

    regards,

    Harish

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.