Skip to Content
avatar image
Former Member

Preparing Technical Specification Doc

Hi All,

is it the right way to develop technical specification documents for PI interfaces before developing interfaces .

as of now no components have been developed ,how can we achieve this.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    avatar image
    Former Member
    Jun 02, 2014 at 05:38 AM

    Hi Vidya Sagar.

    As per the naming standards in your project, you can create a Technical Design (drafted version) based on the business requirements. All ID objects and IR objects that has to be created in the system can be mentioned in the document.

    It is always good to have initial draft version of the TD and later upon completing the build, you need to update the TD with mapping designs.

    Regards

    CK.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jun 02, 2014 at 05:33 AM

    Hi Vidya,

    First you have to prepare the naming standard documnent before creating Techincal specification.

    Regards

    srinivas

    Add comment
    10|10000 characters needed characters exceeded

  • Jun 02, 2014 at 05:36 AM

    Hi Vidya Sagar,

    Tech specs can be prepared before creating interfaces, which would avoid confusion between the namespaces to be used for sender and receiver and the common namespaces. The namespaces sometimes are tricky which, there are chances to get confused with for beginners. It is good, if you document it and follow them also, which would help if more than one developer working on the single object to follow.

    However, you can develop it later too.

    --

    Sndhl.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 21, 2014 at 08:26 AM

    When Technical impact assessment is done?

    Is it done ?After functional requirement document is created?  And before technical specification document? Or Technical impact assessment is done after technical specification document is created?

    Thanks

    Sukhwant


    Add comment
    10|10000 characters needed characters exceeded