Activity lines at kkax/comlwipdoc transactions

Hello SAP Gurus,

When I run kkax transaction, I click at WIP Quantity Document button which takes me to comlwipdoc transaction.

In here, normally I see component quantities and activity quantities which are evaluated as wip.

In my case, I can only see component quantites and there wont be any lines for activity quantities.

For your information, wip activity calculation is totally correct. There is no problem about that.

Only I can't see activity quantities at comlwipdoc transaction, whereas I can see this any other systems.

How could i fix this?

thanks a lot

sadullah

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 30, 2014 at 07:42 AM

    Hi Sadullah,

    Welcome back!

    What do you exactly mean by "whereas I can see this any other systems"?

    Other system in your landscape (which have the sam config settings) or systems with different config stettings?

    I suspect there are to possible reason that you can't see Activity quantities in WIP quantity document;

    1. There were no activity posted in a period shown in WIP quantity document.

    2. Please check config setting for the plant you analyse:

    SPRO -> Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Actual Costing -> Activate Actual Costing: Activate Actual Costing

    Most likely Activity Update column (ActAct) has value 1. In that case activity confirmations are not updating ML quantity structure and are not shown in WIP Quantity Document.

    You need to change it to 2 "Activity update relevant to price determination" in order to see activities in WIP Quantity Document.

    Please analyse your settings and let us know.

    Cheers,

    Szymon

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.